10.17.2010
Evan, Sean and I insulated shop walls. 10/16
Exterior walls are insulated. 10/16
Framing up front porch pillars. 10/16
Sides ready for stucco; roof ready for shingles.
This on 10/16; only 3 weeks after breaking ground.