10.26.2010


Arch between dining area and family room. 10/26



Ashlyn and Hugh Reed in master bedroom. 10/26
Mother on porch. 10/26

Shingles finished; first stucco coat on. 10/26

10.23.2010


Sheetrock finished; most of roof finished. 10-21

10.17.2010


Early Sunday Morning, 10/17

Evan, Sean and I insulated shop walls. 10/16

Exterior walls are insulated. 10/16


Framing up front porch pillars. 10/16



Sides ready for stucco; roof ready for shingles.
This on 10/16; only 3 weeks after breaking ground.

10.14.2010


The faucet for the shower is outside the shower stall.
This way you can turn on the water and when it is
just right, you can step in. Then when you shut it off,
the water doesn't drip on the faucet and corrode it!
It's the "black" thing on the wall with the red and
blue pipes coming out of it.

Arch over other half of kitchen/family room.

Arch over North half of kitchen/family rooom.


Heat & Glo gas-log fireplace.

10.13.2010


Kitchen island being framed up.

Electrical wires being pulled.


Duct work in attic: 10/13