11.02.2010
Kitchen-Family Room arches being enhanced. 11/1
Entry arches being enhanced. 11/1
Gas, Water, and Electricity are installed. 11/1
10.30.2010
Pantry with sloping shelves on left. 101/30
Mothers side of Master Closet. 10/30
Installing septic tank. 10/30
10.26.2010
Happy Halloween!
Kate isn't a Tiger for Halloween---but she came home from Primary Activity Day looking like one...
Happy Halloween
to all of you
!
-B
Arch between dining area and family room. 10/26
Ashlyn and Hugh Reed in master bedroom. 10/26
Mother on porch. 10/26
Shingles finished; first stucco coat on. 10/26
10.23.2010
Sheetrock finished; most of roof finished. 10-21
10.17.2010
Early Sunday Morning, 10/17
Evan, Sean and I insulated shop walls. 10/16
Exterior walls are insulated. 10/16
Framing up front porch pillars. 10/16
Sides ready for stucco; roof ready for shingles.
This on 10/16; only 3 weeks after breaking ground.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)