10.17.2010


Early Sunday Morning, 10/17

Evan, Sean and I insulated shop walls. 10/16

Exterior walls are insulated. 10/16


Framing up front porch pillars. 10/16



Sides ready for stucco; roof ready for shingles.
This on 10/16; only 3 weeks after breaking ground.

10.14.2010


The faucet for the shower is outside the shower stall.
This way you can turn on the water and when it is
just right, you can step in. Then when you shut it off,
the water doesn't drip on the faucet and corrode it!
It's the "black" thing on the wall with the red and
blue pipes coming out of it.

Arch over other half of kitchen/family room.

Arch over North half of kitchen/family rooom.


Heat & Glo gas-log fireplace.

10.13.2010


Kitchen island being framed up.

Electrical wires being pulled.


Duct work in attic: 10/13

10.11.2010


Installing patio/family room windows.


Bedroom windows this afternoon


Mother by fireplace w/Robbie and Steve Newby


Front of house this morning


Back of house this morning 10/11

View from back of house.



Trusses going up.